Client:
Asset Category:
Service Category:
Project Duration:
Location:
Project Value:
Overview of Works:
With 50 bus routes and 531 buses, MBF accounts for 30% of Melbourne’s bus network. Our planning with Kinetic for the 9.5-year term contract was to introduce 36 battery electric buses (BEBs) into the network by mid-2025, commencing in 2022. These vehicles are to be operated with electrical charging infrastructure designed for the Heatherton and Sunshine West depots. Asset Engineering Services provided multiple services to Kinetic in support of this contract including:
Deliverables / Outcomes:
Asset Engineering Services provided numerous deliverables into the contract for Kinetic, in support of this contract, many already outlined in the Scope of Works. In addition, Management Plans have been developed for the Contract and the Company including:
Key Findings: